In one of my earlier posts (May 22, 2010), I talked about using Monte-Carlo simulation for evaluating system capacity using the Universal Scalability Law. This post is an extension of that train of thought.
A very important and convenient feature of the USL model is that its parameters α and β can be evaluated by running a controlled experiment, passing a number of instructions through the system of different numbers of parallel processors and measuring the time it took the system to process these instructions.
(Disclaimer: All charts, diagrams, and values in this post are not based on actual collected data and are provided for illustrative purposes only. All the data were generated and processed using the R programming language)
When we run a controlled experiment, we have a fixed number of processors and a fixed set of tasks, and we measure the throughput. Everything is fixed, and we can quickly calculate the parameters.
However, when we are in a production mode, we may not have such luxury. That will definitely have a negative effect on our ability to get the α and β as deterministic numbers.
We are measuring from the production system whatever we can get, and as a result, we get a distribution of possible αs and a distribution of possible βs of the Universal Scalability Law model.
In this case, we can measure the throughput of a group of processors (a server, or a server pool) over time, collecting the data on throughput and the number of processors in operation on this group of processors at the time that such throughput was measured.
Then from these data, we can estimate the α and β parameters, by using, e.g., the (modified to fit the formula) Multivariate Least-Squares method, or Max-Likelihood Estimation, or any other suitable way to do that. These stochastic methods allow estimating the significance of the model parameters, but more importantly, their distributions.
Once we have these parameters – as probabilistic values – and the number of processors – as a random value with a (uniform?) distribution– we can run the Monte-Carlo simulation and identify the likeliest values of the system throughput, as well as potential pitfalls.
Generally, a regression cannot be extended beyond the range over which it was built. But the universal part of the Universal Scalability Law implies that it can be used with the same parameters for systems whose size and complexity extend beyond the system on which these parameters were calculated.
Thus, keeping the same α and β distributions, and running a Monte-Carlo simulation on a number of processors P extended beyond the original 4-40 range to a range of 32-400 gives the following USL curve:
By running the Monte-Carlo simulation, we can also get the distribution of the Throughput. In the particular example considered here, we have a distribution very strongly skewed to the right (higher end of the throughputs).
We also see that the throughput will have a range of achievable values, which is determined by the α and β distributions calculated above, as well as the distribution of the number of processors running simultaneously on the system under consideration.
It is interesting to look at the throughput curves at various distributions assumed for the numbers of processors running. The plots above described a uniform distribution, meaning that there is a range of numbers of processors, and at any time, each of this numbers has an equal chance of being operational; in other words, the load balancers are working properly.
Alternatively, we may consider a binomial model, wherein a given fraction of the pool of processors is operational at any time. It is a discreet equivalent of the normal distribution, and it is intuitively obvious that the system will behave differently in this model.
Monte-Carlo simulation shows that, indeed, for a binomial distribution of the number of processors running in the group, USL describes a very different behavior:
Here we have 400 processors, of which 25% (100 processors) are operational at any time. All other parameters are the same as in the uniform case analyzed above.
Interestingly enough, replacing that with 110 processors, of which 90% are operational at any time (again the same 100 processors), gives an even different behavior:
It is important to understand that, even if the data behavior doesn’t seem to support the Universal Scalability Law model, it only means that the distribution of the number of servers is non-uniform: these pictures were obtained by using the USL equation.
These last two plots do not mean that it is very difficult to get the USL model parameters by using data obtained from a non-uniform distribution of the number of servers in operation: we assume that the uncertainty in the α and β values comes from us not knowing the exact numbers and not from any inherent indeterminacy of the contention and coherency terms.
In the case of binomial distribution of parallel servers running on the task, we have a nearly normal distribution of throughput (Compare it with the earlier throughput histogram for uniform model of the running processors on the right)
It seems reasonable to theorize that the shape of distribution of a multi-processor system throughput is determined by the way system is operating, and we can, by looking at the historical histogram of throughput for a system, determine the model describing the system’s load balancing operation.
As a side note, if the α and β distributions are not normal, we will have a different shape of throughput distributions.
This blog contains my thoughts on simulation, time series analysis, forecasting, capacity planning, univariate and multivariate data analysis, experimentation, operations research, and other cool topics in applied math and statistics.
Showing posts with label Universal Scalability Model. Show all posts
Showing posts with label Universal Scalability Model. Show all posts
Tuesday, July 6, 2010
Saturday, May 22, 2010
More on Monte-Carlo simulation: If we know the equation.
There are lots of examples of using Monte-Carlo analysis in situations when we have the relationship between the independent variables (factors) and the dependent variable(s).
For example, let's consider a performance-risk-analysis problem for a given multiprocessor system, and suppose we know that this system is described by the universal scalability model derived by Dr. Neil Gunther. (The latter is a very reasonable assumption, considering that the USM is known to be perhaps the most valid representation of multi-processor capacity. Suppose, further, that we have been able to get enough throughput measurements to derive the parameters (σ and k) for this system's model:
(Neil, thank you for the HTML !)
In this formula, C is the throughput, or capacity of the system; α is the contention component, and β is the coherency component of the system in question. The p is the number of processors.
We are asked to predict whether the system will be able to handle the workload given a probability distribution of p = the number of processors operational on this system at any given moment in time (it may just as well be switches, routers, controllers, etc.).
In mathematical terms, we are asked to determine the distribution of the system's throughput (capacity) if the number of processors follows a certain probability distribution.
(This is inserted on July 5, 2002:)In addition, when we are calculating the model parameters α and β, we can only do so with some degree of uncertainty. That implies a distribution of possible values for the parameters, with the calculated numbers being, hopefully, the mean and mode of these distributions. In the best-case scenario, we can assume a normal distribution with a standard deviation of zero, in which case the only probabilistic term is the number of processors in operation.
More in a blog due next week (hopefully)
(End of July 5, 2002 insertion)
We have the formula and the distribution for the p; we vary the p by rolling the dice out of this distribution and calculate the values for the system's capacity, C(p). The more times we roll the dice, the more accurately the data will resemble the distribution of the capacity for this system.
Parenthetically: generally speaking, when applying the Monte-Carlo or any other analytical technique, care must be taken that the distribution of p should be reasonably within the range on which the parameters were determined. In the case of USM, however,this comment may be considered of low relevance.
We then run statistical tests to determine whether the C(p) that we calculated will meet the demands for the system's capacity.
What tests to run, and how to interpret the results, is the subject of another post.
For example, let's consider a performance-risk-analysis problem for a given multiprocessor system, and suppose we know that this system is described by the universal scalability model derived by Dr. Neil Gunther. (The latter is a very reasonable assumption, considering that the USM is known to be perhaps the most valid representation of multi-processor capacity. Suppose, further, that we have been able to get enough throughput measurements to derive the parameters (σ and k) for this system's model:
| C(p) | = | p 1 + α (p − 1) + β p (p − 1) | (1) |
(Neil, thank you for the HTML !)
In this formula, C is the throughput, or capacity of the system; α is the contention component, and β is the coherency component of the system in question. The p is the number of processors.
We are asked to predict whether the system will be able to handle the workload given a probability distribution of p = the number of processors operational on this system at any given moment in time (it may just as well be switches, routers, controllers, etc.).
In mathematical terms, we are asked to determine the distribution of the system's throughput (capacity) if the number of processors follows a certain probability distribution.
(This is inserted on July 5, 2002:)In addition, when we are calculating the model parameters α and β, we can only do so with some degree of uncertainty. That implies a distribution of possible values for the parameters, with the calculated numbers being, hopefully, the mean and mode of these distributions. In the best-case scenario, we can assume a normal distribution with a standard deviation of zero, in which case the only probabilistic term is the number of processors in operation.
More in a blog due next week (hopefully)
(End of July 5, 2002 insertion)
We have the formula and the distribution for the p; we vary the p by rolling the dice out of this distribution and calculate the values for the system's capacity, C(p). The more times we roll the dice, the more accurately the data will resemble the distribution of the capacity for this system.
Parenthetically: generally speaking, when applying the Monte-Carlo or any other analytical technique, care must be taken that the distribution of p should be reasonably within the range on which the parameters were determined. In the case of USM, however,this comment may be considered of low relevance.
We then run statistical tests to determine whether the C(p) that we calculated will meet the demands for the system's capacity.
What tests to run, and how to interpret the results, is the subject of another post.